Tunneling

Tunnel Boring Machine
Liverpool Street tunnel image
Lone Miner
Man Rider Entering Grout Shafts Soho London
Ring Building
Crossrail Elenour Street Shaft
Connaught Tunnel
Bond Street
SCL
Breakthrough Maintenance on TBM
Secondary Lining
Secondary Lining SCL
Segment Building on TBM
Waterproofing Fisher Street Shaft
Stepney Green Crossrail Construction
Big Civils Tunnel Engineering
Tunnel Muck Away Northfleet
Preparation for Foam Concrete at Hanover Square Bond Street Station
Civil Engineers & Diversity
Tunnel Segment Loading
Tunnel Segment Factory Old Oak Common
Connaught Tunnel Refurbishment
Team BFK Segment Building BAM Ferrovial Kier
California Crossing in Running Tunnels
TBM Breakthrough at Liverpool Street
Steel Fixers work on shaft base slab
CEO Crossrail
First TBM Breakthrough at Liverpool Street
Spray Concrete Lining
Team BFK Western Running Tunnels Third Way Point Celebrations
Tottenham Court Road Tunnel Fireproofing and Handover
Crossrail
1 Millions of Muck Away to Wallasea Island Celebration at Northfleet
East Running Tunnel at Tottenham Court Road BFK to Laing O\'Rourke
Tottenham Court Road East Bound Tunnel Fireproofing and Handover
Steel Fixing at Crossrail Finsbury Circus for Liverpool Street Station
Gantry Crane Drivers View over Tunnel Segment Yard
Tunnel Boring Machine Construction at Dragados Sisk Limmo Peninsula
Platform Tunnels
Grout Shaft Workers in Mayfair
TBM Build at Limmo peninsula Canning Town
Tunnel Boring Machine Driver
Tunnel Segment Factory Chatham Dockyard
Tunnel Segments Storage
The Lowering of the TBM
Steel Framework at Tottenham Court Road for Drainage Sump
Tunnel Excavation Whitechapel
Sprayers
Lowering of Crossrail TBM at Limmo Peninsula Canning Town London
Scaffolders Unload Kit from Crane into Shaft at Elenour Street
The Two New TBM\'s before entering their tunnel mission
Bond Street Waterproofing
Gantry Crane Lifted into position at Tottenham Court Road Western Ticket Hall
Aerial of Crossrail Bond Street Station under construction
Temporary Steel Supports
Transport Minister Visits Crossrail at Whitechapel Station
Royal Oak Portal Tunnel Entrance and Loco Tracks
Grout Drilling
Various Segments and Keys
Slinger moves TBM Cutter Head
Crosspassages and Access Shaft
Concrete Segment Yard
Concrete Piles
Hanover Square North East Shaft
Connaught Tunnel Refurbishment
Running Tunnel Inspection by Lead Miner
Crossrail Muck Belts at Paddington
Concrete Piling to form Temporary Shaft
Wooden Heading Bell shape Grout Shaft Soho London
Tunnel and Air Ventilation
Female Slinger loads TBM Cutter Head
Segment Building Yard
Shaft Props
TBM Cutter Head being fixed
Cross Passages and Miners
Elenour Street Shaft and waterproof Lining

Tunnel Boring Machine